1 |
Pengadaan Panel DCPDU |
PT. Optimal Tata Mandiri |
2022 |
DCPDU Dual Source 1200A |
2 |
Wiring Cable |
PT. Matsukou Global Internasional |
2022 |
Electrical QC Room Wiring Cable |
3 |
Modifikasi Panel LV DB |
PT. Denki Engineering |
2022 |
Modification Panel LV DB |
4 |
Pengadaan Panel LV DB |
PT. Energi Indonesia Persada |
2022 |
Panel LV DB |
5 |
Pengadaan Panel LV DB |
PT. Denki Engineering |
2022 |
LV Panel (Included FAT ; PACKING ; DOCUMENTATION) |
6 |
Pengadaan Panel DCPDU |
PT. Sarana Komunikasi Data |
2022 |
DCPDU Standing Rack 19" 600x2100x800mm (WxHxD) Dual Source Power 630A |
7 |
Pengadaan Rapture Disk |
PT. Cipta Mulia Semesta |
2022 |
Rupture Disk (1. Holder HIA, 2. Asseories, 3. Rupture Disk) |
8 |
Sistem Building Automatic System |
Telkom Landmark Tower |
2021 |
Pekerjaan Program dan Konfigurasi Alarm di Sistem Building Automatic System (BAS) |
9 |
Relocation / Re-Installation |
SMS Group |
2021 |
Relocation / Re-Installation of Excitation Trafos |
10 |
Pengadaan MCB |
Lintas Teknologi Indonesia |
2021 |
MCB ETA 25A 8335, MCB ETA 6A 8335 |
11 |
Projcet JO Electrical |
PT. Krakatau Engineering |
2021 |
Proyek HSM #2 Project Paket JO Elektrical Work |
12 |
Pulling |
SMS Group |
2021 |
Disconnection and Reconnecting Cables |
13 |
Pulling |
SMS Group |
2021 |
Cable Pulling and Termination Nox-Analyser Cabinet |
14 |
Pengadaan Panel MTC |
Hino Motors Manufacturing Indonesia |
2021 |
MTC-7700 / Structure Packing Axle 17 Inch Export Installation |
15 |
Panel Console |
Matsukou Global Internasional |
2021 |
Panel Console 2400mm |
16 |
Dismantling |
Hino Motors Manufacturing Indonesia |
2021 |
Unpacking Area Structure Dismantle Ex-Engine Line |
17 |
Pengadaan dan Instalasi Panel ATS |
RS. Mary Cileungsi Hijau |
2021 |
Pekerjaan Penggantian / Replace ATS 400A 197KVA di Gedung B |
18 |
Pekerjaan Cable Pulling and Termination |
SMS Group |
2021 |
Additional Cable Pulling and Termination for RGL unit |
19 |
Pekerjaan Cable Pulling and Termination |
SMS Group |
2021 |
Pekerjaan Cable Pulling and Termination for MCD Down Coiler Area |
20 |
Pengadaan dan Setting Battery Capacity Bank |
Data Integrasi Solusindo, PT |
2021 |
Pengiriman Material (Eagle Eye) 1 Unit ke Manado via Laut + Akomodasi Trainer |
21 |
Pengadaan dan Setting Battery Capacity Bank |
Data Integrasi Solusindo, PT |
2021 |
Programable Battery Capacity Tester Eagle Eye, LB Series Model : LB-48-400-CCS 48V-400A |
22 |
Pengadaan Panel DCPDU |
PT. Dwimitra Ekatama Mandiri |
2020 |
Panel DCPDU 1500A |
23 |
Pengadaan dan Setting Battery Capacity Bank |
PT. Agungmas Prima Sempurna |
2020 |
Pekerjaan Programable Battery Capacity Tester Eagle Eye, LB Series LB-48-400-CCS |
24 |
Panel DCPDU |
PT. Kawan Sejati Telsindo |
2020 |
Pengadaan Panel DCPDU Dual Source |
25 |
Panel DCPDU |
PT. Kawan Sejati Telsindo |
2020 |
Pengadaan Panel DCPDU 1200A |
26 |
Daily Assistant for Commissioning |
SMS Group |
2020 |
Daily Assistant for Commissioning in HSM #2 |
27 |
Pengadaan Panel DCPDU |
PT. Dwimitra Ekatama Mandiri |
2020 |
Pengadaan Panel DCPDU 1500A |
28 |
Panel DCPDU |
PT. Media Telekomunikasi Mandiri |
2019 |
Panel DCPDU 2 Source 48VDC 630A |
29 |
Panel DCPDU |
PT. Sarana Komunikasi Data |
2019 |
Panel DCPDU 4S 48VDC 630A |
30 |
Reel Board Sliding |
PT. Hino Manufacture Indonesia |
2019 |
Reel Board Sliding 5000 mm |
31 |
Papan Frame |
PT. Hino Manufacture Indonesia |
2019 |
Papan Frame Pengumuman |
32 |
Real Boarding |
PT. Hino Manufacture Indonesia |
2018 |
Reel Board Sliding 5000 mm, 6000 mm |
33 |
Jig Press |
PT. Hino Manufacture Indonesia |
2018 |
Modifikasi Diagonal Jig Press |
34 |
Pengadaan Inverter |
PT. Recci Indonesia |
2018 |
Pengadaan Inverter Telkomsel (Ericsson) |
35 |
Panel DCPDU |
PT. Optimal Tata Mandiri |
2018 |
DCDU DUAL SOURCE 1200A Telkomsel |
36 |
Panel DCPDU |
PT. Optimal Tata Mandiri |
2018 |
DCPDU DUAL SOURCE 1200A Telkomsel |
37 |
Migrasi |
PT. Kawan Sejati Telsinda |
2018 |
Installation Material |
38 |
Migrasi |
PT. Kawan Sejati Telsinda |
2018 |
Installation Material |
39 |
Migrasi |
PT. Kawan Sejati Telsinda |
2018 |
Installation Material |
40 |
Migrasi |
PT. Kawan Sejati Telsinda |
2018 |
Installation Material |
41 |
Migrasi |
PT. Kawan Sejati Telsinda |
2018 |
Installation Material |
42 |
Real Board Safety |
PT. Hino Manufacture Indonesia |
2018 |
Reel Board Safety ( Papan Pengumuman ) |
43 |
Installation Electrical Instrument |
PT. Krakatau Engineering |
2018 |
Installation Electrical Instrument WTP Area |
44 |
Installation Electrical Instrument |
PT. Krakatau Engineering |
2018 |
Installation Electrical Instrument Main Bay Area |
45 |
Panel DCPDU 1200A |
PT. Indomitra Global |
2018 |
Panel DCPDU Dual Source 1200A |
46 |
Instalasi Panel DCPDU |
PT. KST |
2018 |
Jasa Pemasangan Panel DCPDU Site Maumere |
47 |
Instalasi Panel DCPDU |
PT. KST |
2018 |
Jasa Pemasangan Panel DCPDU Site Kupang |
48 |
Panel DCPDU 1200A |
PT. Optimal Tata Mandiri |
2018 |
DCPDU 1200A Huawei Telkomsel 2 Unit |
49 |
Panel DCPDU 1200A |
PT. Optimal Tata Mandiri |
2018 |
DCPDU 1200A Huawei Telkomsel 4 Unit |
50 |
Panel DCPDU 1200A |
PT. KST |
2018 |
Pengadaan Panel DCPDU Dual Source 1200A Site Kupang |
51 |
Panel DCPDU 1200A |
PT. KST |
2018 |
Pengadaan Panel DCPDU Dual Source 1200A Site Maumere |
52 |
Instalasi Panel DCPDU |
PT. KST |
2018 |
Jasa Pemasangan DCPDU |
53 |
Instalasi Panel DCPDU |
PT. KST |
2018 |
Jasa Pemasangan DCPDU STO Singaraja |
54 |
Panel DCPDU 1200A |
PT. KST |
2018 |
DCPDU Dual Source 1200A STO Jayapura |
55 |
Panel DCPDU 1200A |
PT. KST |
2018 |
DCPDU Dual Source 1200A STO Singaraja |
56 |
Panel DCPDU 1200A |
PT. Optimal Tata Mandiri |
2018 |
DCPDU Dual Source 1200 A |
57 |
Pekerjaan Panel PDU |
PT. Kawan Sejati Telsindo |
2018 |
Pekerjaan PDU Area Sulawesi Bali |