| 1 |
Pengadaan Panel DCPDU |
PT. Optimal Tata Mandiri |
2022 |
DCPDU Dual Source 1200A |
| 2 |
Wiring Cable |
PT. Matsukou Global Internasional |
2022 |
Electrical QC Room Wiring Cable |
| 3 |
Modifikasi Panel LV DB |
PT. Denki Engineering |
2022 |
Modification Panel LV DB |
| 4 |
Pengadaan Panel LV DB |
PT. Energi Indonesia Persada |
2022 |
Panel LV DB |
| 5 |
Pengadaan Panel LV DB |
PT. Denki Engineering |
2022 |
LV Panel (Included FAT ; PACKING ; DOCUMENTATION) |
| 6 |
Pengadaan Panel DCPDU |
PT. Sarana Komunikasi Data |
2022 |
DCPDU Standing Rack 19" 600x2100x800mm (WxHxD) Dual Source Power 630A |
| 7 |
Pengadaan Rapture Disk |
PT. Cipta Mulia Semesta |
2022 |
Rupture Disk (1. Holder HIA, 2. Asseories, 3. Rupture Disk) |
| 8 |
Sistem Building Automatic System |
Telkom Landmark Tower |
2021 |
Pekerjaan Program dan Konfigurasi Alarm di Sistem Building Automatic System (BAS) |
| 9 |
Relocation / Re-Installation |
SMS Group |
2021 |
Relocation / Re-Installation of Excitation Trafos |
| 10 |
Pengadaan MCB |
Lintas Teknologi Indonesia |
2021 |
MCB ETA 25A 8335, MCB ETA 6A 8335 |
| 11 |
Projcet JO Electrical |
PT. Krakatau Engineering |
2021 |
Proyek HSM #2 Project Paket JO Elektrical Work |
| 12 |
Pulling |
SMS Group |
2021 |
Disconnection and Reconnecting Cables |
| 13 |
Pulling |
SMS Group |
2021 |
Cable Pulling and Termination Nox-Analyser Cabinet |
| 14 |
Pengadaan Panel MTC |
Hino Motors Manufacturing Indonesia |
2021 |
MTC-7700 / Structure Packing Axle 17 Inch Export Installation |
| 15 |
Panel Console |
Matsukou Global Internasional |
2021 |
Panel Console 2400mm |
| 16 |
Dismantling |
Hino Motors Manufacturing Indonesia |
2021 |
Unpacking Area Structure Dismantle Ex-Engine Line |
| 17 |
Pengadaan dan Instalasi Panel ATS |
RS. Mary Cileungsi Hijau |
2021 |
Pekerjaan Penggantian / Replace ATS 400A 197KVA di Gedung B |
| 18 |
Pekerjaan Cable Pulling and Termination |
SMS Group |
2021 |
Additional Cable Pulling and Termination for RGL unit |
| 19 |
Pekerjaan Cable Pulling and Termination |
SMS Group |
2021 |
Pekerjaan Cable Pulling and Termination for MCD Down Coiler Area |
| 20 |
Pengadaan dan Setting Battery Capacity Bank |
Data Integrasi Solusindo, PT |
2021 |
Pengiriman Material (Eagle Eye) 1 Unit ke Manado via Laut + Akomodasi Trainer |
| 21 |
Pengadaan dan Setting Battery Capacity Bank |
Data Integrasi Solusindo, PT |
2021 |
Programable Battery Capacity Tester Eagle Eye, LB Series Model : LB-48-400-CCS 48V-400A |
| 22 |
Pengadaan Panel DCPDU |
PT. Dwimitra Ekatama Mandiri |
2020 |
Panel DCPDU 1500A |
| 23 |
Pengadaan dan Setting Battery Capacity Bank |
PT. Agungmas Prima Sempurna |
2020 |
Pekerjaan Programable Battery Capacity Tester Eagle Eye, LB Series LB-48-400-CCS |
| 24 |
Panel DCPDU |
PT. Kawan Sejati Telsindo |
2020 |
Pengadaan Panel DCPDU Dual Source |
| 25 |
Panel DCPDU |
PT. Kawan Sejati Telsindo |
2020 |
Pengadaan Panel DCPDU 1200A |
| 26 |
Daily Assistant for Commissioning |
SMS Group |
2020 |
Daily Assistant for Commissioning in HSM #2 |
| 27 |
Pengadaan Panel DCPDU |
PT. Dwimitra Ekatama Mandiri |
2020 |
Pengadaan Panel DCPDU 1500A |
| 28 |
Panel DCPDU |
PT. Media Telekomunikasi Mandiri |
2019 |
Panel DCPDU 2 Source 48VDC 630A |
| 29 |
Panel DCPDU |
PT. Sarana Komunikasi Data |
2019 |
Panel DCPDU 4S 48VDC 630A |
| 30 |
Reel Board Sliding |
PT. Hino Manufacture Indonesia |
2019 |
Reel Board Sliding 5000 mm |
| 31 |
Papan Frame |
PT. Hino Manufacture Indonesia |
2019 |
Papan Frame Pengumuman |
| 32 |
Real Boarding |
PT. Hino Manufacture Indonesia |
2018 |
Reel Board Sliding 5000 mm, 6000 mm |
| 33 |
Jig Press |
PT. Hino Manufacture Indonesia |
2018 |
Modifikasi Diagonal Jig Press |
| 34 |
Pengadaan Inverter |
PT. Recci Indonesia |
2018 |
Pengadaan Inverter Telkomsel (Ericsson) |
| 35 |
Panel DCPDU |
PT. Optimal Tata Mandiri |
2018 |
DCDU DUAL SOURCE 1200A Telkomsel |
| 36 |
Panel DCPDU |
PT. Optimal Tata Mandiri |
2018 |
DCPDU DUAL SOURCE 1200A Telkomsel |
| 37 |
Migrasi |
PT. Kawan Sejati Telsinda |
2018 |
Installation Material |
| 38 |
Migrasi |
PT. Kawan Sejati Telsinda |
2018 |
Installation Material |
| 39 |
Migrasi |
PT. Kawan Sejati Telsinda |
2018 |
Installation Material |
| 40 |
Migrasi |
PT. Kawan Sejati Telsinda |
2018 |
Installation Material |
| 41 |
Migrasi |
PT. Kawan Sejati Telsinda |
2018 |
Installation Material |
| 42 |
Real Board Safety |
PT. Hino Manufacture Indonesia |
2018 |
Reel Board Safety ( Papan Pengumuman ) |
| 43 |
Installation Electrical Instrument |
PT. Krakatau Engineering |
2018 |
Installation Electrical Instrument WTP Area |
| 44 |
Installation Electrical Instrument |
PT. Krakatau Engineering |
2018 |
Installation Electrical Instrument Main Bay Area |
| 45 |
Panel DCPDU 1200A |
PT. Indomitra Global |
2018 |
Panel DCPDU Dual Source 1200A |
| 46 |
Instalasi Panel DCPDU |
PT. KST |
2018 |
Jasa Pemasangan Panel DCPDU Site Maumere |
| 47 |
Instalasi Panel DCPDU |
PT. KST |
2018 |
Jasa Pemasangan Panel DCPDU Site Kupang |
| 48 |
Panel DCPDU 1200A |
PT. Optimal Tata Mandiri |
2018 |
DCPDU 1200A Huawei Telkomsel 2 Unit |
| 49 |
Panel DCPDU 1200A |
PT. Optimal Tata Mandiri |
2018 |
DCPDU 1200A Huawei Telkomsel 4 Unit |
| 50 |
Panel DCPDU 1200A |
PT. KST |
2018 |
Pengadaan Panel DCPDU Dual Source 1200A Site Kupang |
| 51 |
Panel DCPDU 1200A |
PT. KST |
2018 |
Pengadaan Panel DCPDU Dual Source 1200A Site Maumere |
| 52 |
Instalasi Panel DCPDU |
PT. KST |
2018 |
Jasa Pemasangan DCPDU |
| 53 |
Instalasi Panel DCPDU |
PT. KST |
2018 |
Jasa Pemasangan DCPDU STO Singaraja |
| 54 |
Panel DCPDU 1200A |
PT. KST |
2018 |
DCPDU Dual Source 1200A STO Jayapura |
| 55 |
Panel DCPDU 1200A |
PT. KST |
2018 |
DCPDU Dual Source 1200A STO Singaraja |
| 56 |
Panel DCPDU 1200A |
PT. Optimal Tata Mandiri |
2018 |
DCPDU Dual Source 1200 A |
| 57 |
Pekerjaan Panel PDU |
PT. Kawan Sejati Telsindo |
2018 |
Pekerjaan PDU Area Sulawesi Bali |